Skip to content

Spars Continue

July 5, 2011

In between the various family activities with the holiday weekend I continued working on the spars.  Much of the work is monotonous.  After writing my last post I dug in a bit deeper and found a different way to do things.  I match drill everything.  Counter sink the #40 holes.  Then I place my “jig” and CS my #19.  This works for me.  There are 4 surfaces to do, both spars top and bottom.  There are 30 attach points / side, 120 in all.  240 #40 holes to cs and 120 #19 holes to cs.

Counter sinking makes a huge mess.  There are aluminum chips and filings everywhere.  They get in your shoes and in your hair.  Here are a few pictures of the mess.

I’ll be out of the shop for a few days traveling.

Advertisements

From → Build Log, Spars, Wings

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: